Application steps of laminating machine
1. Check the start-up equipment, turn on the power switch, turn on the power indicator light, display the voltage of 380V on the voltmeter, open the cylinder valve of the LPG station, and activate the carburetor heating device.
2. Turn on the compressed air switch, and the normal working pressure is required to be greater than 0.5MPa.
3. Adjust the equipment to the automatic production state, and determine
If the color is correct, start the equipment in turn; According to the requirements, the formula requirements and production process parameters are input into the PLC control computer.
4. In the production process, always pay attention to the abnormal operation of the equipment to ensure that the storage state of raw materials is sufficient
Full production, to prevent the hoist is blocked, finished product hopper storage state.
5. In the production process, always pay attention to the accuracy of setting, in order to increase various raw materials, such as net weight and timing, and determine whether the mixing time and cooling time of raw materials meet the requirements of process quality.